Pinewood School

The construction work to build a new sports hall for Pinewood School in Bourton.

 

The project was extremely successful with families and friends of Pinewood School attending the opening of the sports hall. The sports hall was opened by A.P McCoy and received fantastic feedback not only from members at the event but also the school itself.

 

RJ Leighfield & Sons prides itself on the relationship it has built with Pinewood School over the years and feels that their ethos on how building and business should be done shines through with this relationship.

This design and build project of a two-storey facility comprised changing rooms, showers, drying rooms and locker room, to provide daily sports changing for almost 300 children on a visually sensitive site, sandwiched between a swimming pool and a wooded copse. Design work was carried out by DPDS Consulting Group resulting in a traditional construction with a reinforced slab, precast concrete first floor and profiled sheet cladding roof. The external envelope was a mixture of face brickwork, render and Siberian larch.

Broome Manor Golf Club

This was a refurbishment contract compiled in 2 phases with the golf club. Phase 1 was the refurbishment of the main club house due to previous works resulted in a huge health and safety risk with a main beam coming down from the ceiling; phase 2 was the refurbishment of the professional shop, again which has suffered from works done before the project was given to RJ Leighfields.

© RJ Leighfield & Sons Ltd 2018

RJ Leighfield & Sons Ltd

Registered in England & Wales No. 247253

VAT No. 194 7125 44

FAX: 01793 853488

TEL: 01793 856380

  • Facebook