SW Logistics Depot 

Project comprised of a Design and Build warehouse with associated offices, staff toilets and canteen.

Steel framed building with insulated Plastisol coated cladding to walls and roof incorporating 10% translucent sheets. 4 loading bays with roller shutters and dock levellers and a separate vehicle access roller shutter door with ramped access. There are 4 steel personnel fire exit doors to the warehouse.

Office areas at ground and first floor with suspended ceilings, dado trunking. Disabled lift and concrete staircase with glazed/stainless steel balustrade provide access to the first floor with additional steel access stair giving direct access back into the warehouse.

External works included a concrete yard, stormwater storage pond, sewage treatment plant and EV charging point.